After further investigations of the site, the canal lock was of particular interest as the first sketch of the site was the lock. 
Surveys were made. The mechanism of the lock is of the highest of importance as it defines the whole purpose of the lock. 

  

General Overview of the Lock Operation

General Overview of the Lock Operation [Detail]

The Lock operation was crucial as it would have a direct relation to the design brief. From the aspect of the time range, to the steps of the whole operation. The mapping were done in two ways : before the water level rises ; after the water level rises  



Lock Operation [before water level rises]
Lock Operation 
















[after water level rises]